首页 社会内容详情
皇冠体育(www.hg108.vip):KPower gets four-year PPA extension

皇冠体育(www.hg108.vip):KPower gets four-year PPA extension

分类:社会

网址:

SEO查询: 爱站网 站长工具

点击直达

皇冠体育www.hg108.vip)是一个开放皇冠正网即时比分、皇冠官方的平台。皇冠体育(www.hg108.vip)提供最新皇冠登录,皇冠体育包含新皇冠体育代理、会员APP,提供皇冠官网代理开户、皇冠官网会员开户业务。

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

PETALING JAYA: KPower Bhd’s subsidiary – PKNP KPower Suria Sdn Bhd (PKSSB) – has obtained an extension from the Energy Commission (EC) for the development of a 50MW solar photovoltaic plant in Pahang.

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

,

皇冠登1登2登3www.99cx.vip)实时更新发布最新最快最有效的登1登2登3代理网址,包括新2登1登2登3代理手机网址,新2登1登2登3代理备用网址,皇冠登1登2登3代理最新网址,新2登1登2登3代理足球网址,新2网址大全。

,

KPower said the scheduled commercial operation date had been extended to Dec 31, 2023 from Sept 30, 2023 while the tenure of the power purchase agreement or PPA was from 21 years to 25 years.


转载说明:本文转载自Sunbet。

发布评论